The Air division provides programme management, engineering and construction services to customers with air-related infrastructure requirements such as airport operators, airlines and associated stakeholders.

Our Air operations have been based at Heathrow and Gatwick for many years, where we have secured a strong reputation for the delivery of complex projects within live airport environments.

The services provided by the division include programme management, construction management, the provision of pre-construction consultancy and main contracting for all stages of the project life-cycle, leading to the handover of major programmes of work.

Current projects include the extension of the check-in area of Heathrow’s Terminal 4. The division is also managing the entire programme of capital works at Gatwick’s south terminal, a £400 million programme up to 2013.

This Programme Integrator role involves leading the options development, scheme design, production design and physical delivery of the south terminal projects.

11/02/2010 - Air Division Praised for Site Safety
The Air division has been praised by London Gatwick Airport for the high safety scores received following a recent audit as part of the Considerate Constructors Scheme.

22/10/2009 - Gatwick Airport South Terminal
On 12th October, David Joyce, Managing Director of VINCI Construction UK Limited, attended the contract signing ceremony for the £31m refurbishment of Pier 2 at Gatwick Airport.

27/08/2009 - Success at Terminal 4 - Check-in Zones Delivered Six Weeks Early
Two new check-in zones, encompassing 42 new check-in desks, have been handed over six weeks early by the Air Division as part of the £70m terminal extension and refurbishment project they are undertaking at Heathrow’s Terminal 4.